We ripped out the tile instead of keeping it. It was too difficult to figure out how to marry the concrete that needed to be poured in the area of the old vanity with the existing tile floor. We are going to lay concrete over the entire floor rather than skim coating over the tile and filling in a small area.
A bag of concrete was five dollars, and we will probably need two 80 pound bags. I also got a black color additive for a few dollars. We'll need to purchase a concrete sealer as well.
Other plans include paint for the wall, making a faux concrete floating counter with the existing sink, and the addition of a large mirror after the hole in the wall where the medicine cabinet was is filled.
We were quoted $900.00 for the remodel of our powder room, so this is by far a much less expensive way to go.
A bag of concrete was five dollars, and we will probably need two 80 pound bags. I also got a black color additive for a few dollars. We'll need to purchase a concrete sealer as well.
Other plans include paint for the wall, making a faux concrete floating counter with the existing sink, and the addition of a large mirror after the hole in the wall where the medicine cabinet was is filled.
We were quoted $900.00 for the remodel of our powder room, so this is by far a much less expensive way to go.